Underground Utility Trenching in Sydney, NSW

What is included

What Is Included in Our Underground Utility Trenching

  • We get the underground service plans for the property before any machine is unloaded.
  • The route is marked out in paint, with existing services located and flagged along the way.
  • The mini excavator comes in through the side passage, with boards laid over lawn and paths.
  • Spoil is stacked along one side of the trench or loaded straight into the tipper.
  • The trench is dug to the depth and width that each trade has asked for.
  • Where several services share one trench, we leave the separation each one needs between them.
  • Once the trades have laid and checked their lines, we backfill in layers and compact each one.
  • We rake the surface level, sweep the paths and take the leftover spoil away.

Why us

Why Choose Us for Underground Utility Trenching?

Accountable for every job, long after the day

Every underground utility trenching job is done by the people who will still be here next year.

Tested and signed off before we leave

Everything we touch on your underground utility trenching is tested before we go, you get walked through exactly what was done.

Local excavation contractors, not a call centre

An excavation contractor answers the phone and the same faces come back if the job runs over a day.

How the job runs

Shared trenches work when every trade agrees first

01

Tell us what runs where

On the first call we ask which services the trench has to carry and where each one starts and ends. Power, water, sewer and communications lines each have their own depth and spacing. If an electrician or plumber is already on the job, we would like their numbers so we can check the details with them directly.

02

A quote built on the route

The written quote sets out the route, the trench depth and width, how the spoil leaves site and how the ground is put back. Rock is the unknown. How deep it sits only shows once the bucket is in the ground, so the quote says how rock is handled and you hear about it the moment we hit it.

03

Dig, lay, check, backfill

On the day we open the trench in sections, so the trades can lay their lines while the ground is fresh. Nothing gets covered until the electrician and plumber have finished and their work has been checked. Then we backfill in compacted layers, put marker tape in above the lines and leave the surface raked level.

Common questions

Frequently Asked Questions

What size jobs do you take on?

Small residential jobs through to larger civil and infrastructure work. A single trench across a front lawn, a set of footings for an extension, a bulk cut for a new slab and the underground services for a commercial site are all jobs we do.

Can your machine get into a narrow side passage?

Usually, yes. A mini excavator fits through most gates and side passages that a larger machine cannot. Send a photo of the narrowest point with a tape measure across it, and we will tell you whether the machine fits or whether that part has to be dug by hand.

Do you connect the power, water or sewer once the trench is dug?

No. We do the civil side: digging the trench to depth, bedding, laying the conduit or pipe, installing pits, backfilling and reinstating. The connection, testing and sign-off are done by an electrician or a plumber, and we work around their timing.

What is non-destructive digging, and when do I need it?

It means opening the ground with water and vacuum, or by hand, instead of a bucket. It is used where cables, gas lines or water mains are close to the dig, so they can be found and exposed without being damaged.

Do you take the spoil away?

Where the job calls for it, yes. Spoil is loaded into a tipper and taken off site. Where it can be reused on the block for backfill or levelling, we talk about that with you first, because it changes how much leaves the site.

What if you hit rock or old fill?

How deep the rock sits, and whether there is buried rubble or old fill, only shows once the bucket is in the ground. If we find something that changes the job, we stop and tell you before the work carries on.

Do you check for underground services before digging?

Every time. We get the underground service plans for the site before we dig, through Before You Dig Australia, and anything close to the line is exposed by hand or vacuum before a machine works near it.

Do you do strip outs and demolition?

Yes, including bathroom strip outs and wider internal strip outs. If old sheeting or materials might contain asbestos, they have to be tested before anything is broken. If that is the case, we stop and tell you, because we do not remove asbestos.

Can you level a yard and lay turf?

Yes. Landscaping covers clearing, levelling and grading the ground so water runs away from the house, building up garden beds and edges, and laying turf once the ground is ready.

Do you need the engineer's plans?

For footings, slab cuts and bulk excavation, yes. The engineer's plans set the depth, width and position of what we dig. For a trench or a landscaping job, a site plan or a few photos are usually enough.

Can I call you outside business hours?

Yes. We answer the phone at any hour, every day. If a trench has collapsed or a pipe has been hit, tell us the suburb and what has happened, and keep people back from the edge until we talk.

Which areas do you cover?

We travel across Sydney, from the CBD and inner south to Parramatta, Western Sydney, the south-west, and St George and Sutherland. If your suburb is not on our list, ask anyway.

Ready when you are

Book Underground Utility Trenching in Sydney Today

Send us the site plan with the start and end point of each service marked on it. A phone photo of a printed plan with pen marks is enough. Text it to the mobile or email it, and we will come back with any questions about depth and access.

0485 057 312

24 hours a day, 7 days a week

Not urgent? Send us the job instead