Civil Excavation and Earthworks in Sydney, NSW

What is included

What Is Included in Our Civil Excavation and Earthworks

  • We get the underground service plans for the whole site before any machine is unloaded.
  • We walk the site with your civil drawings and the surveyor's pegs to confirm levels, offsets and set-out.
  • We agree where trucks stand, where spoil is stockpiled and what leaves site against what stays for fill.
  • Topsoil is stripped and stockpiled separately so it can go back on the finished batters and verges.
  • We cut and fill to the design levels, checking grades against the pegs as each area comes down.
  • Fill goes down in thin lifts, each one compacted, so it does not settle under a slab later.
  • Batters are trimmed to the angle on the drawings and stormwater is given somewhere to run during the job.
  • At handover we walk the finished levels with your site manager and leave the pegs standing.

Why us

Why Choose Us for Civil Excavation and Earthworks?

Accountable for every job, long after the day

Every civil excavation and earthworks job is done by the people who will still be here next year.

Tested and signed off before we leave

Everything we touch on your civil excavation and earthworks is tested before we go, you get walked through exactly what was done.

Local excavation contractors, not a call centre

An excavation contractor answers the phone and the same faces come back if the job runs over a day.

How the job runs

Why levels are agreed before the first cut

01

Start with the drawings

Tell us what is being built, where the site is and what drawings exist. A civil plan with design levels changes how we price it compared with a rough sketch. We ask about truck access from the street and whether any spoil has to go off site. If the job suits us, we arrange a time to walk it.

02

A quote built on volumes

The written quote sets out the cut, the fill, and the spoil that leaves site, worked from your levels. It says what ground we have allowed for. Rock, buried concrete or old fill only show once the bucket is in, and if we hit them you hear about it then, before any extra work starts.

03

Working to the pegs

We arrive, set up where we agreed and work to the surveyor's pegs. Grades are checked against the pegs through the day as each area comes down. Before we leave, we walk the finished levels with you, point out anything that differed from the drawings, and leave the site tidy for the next trade.

Common questions

Frequently Asked Questions

What size jobs do you take on?

Small residential jobs through to larger civil and infrastructure work. A single trench across a front lawn, a set of footings for an extension, a bulk cut for a new slab and the underground services for a commercial site are all jobs we do.

Can your machine get into a narrow side passage?

Usually, yes. A mini excavator fits through most gates and side passages that a larger machine cannot. Send a photo of the narrowest point with a tape measure across it, and we will tell you whether the machine fits or whether that part has to be dug by hand.

Do you connect the power, water or sewer once the trench is dug?

No. We do the civil side: digging the trench to depth, bedding, laying the conduit or pipe, installing pits, backfilling and reinstating. The connection, testing and sign-off are done by an electrician or a plumber, and we work around their timing.

What is non-destructive digging, and when do I need it?

It means opening the ground with water and vacuum, or by hand, instead of a bucket. It is used where cables, gas lines or water mains are close to the dig, so they can be found and exposed without being damaged.

Do you take the spoil away?

Where the job calls for it, yes. Spoil is loaded into a tipper and taken off site. Where it can be reused on the block for backfill or levelling, we talk about that with you first, because it changes how much leaves the site.

What if you hit rock or old fill?

How deep the rock sits, and whether there is buried rubble or old fill, only shows once the bucket is in the ground. If we find something that changes the job, we stop and tell you before the work carries on.

Do you check for underground services before digging?

Every time. We get the underground service plans for the site before we dig, through Before You Dig Australia, and anything close to the line is exposed by hand or vacuum before a machine works near it.

Do you do strip outs and demolition?

Yes, including bathroom strip outs and wider internal strip outs. If old sheeting or materials might contain asbestos, they have to be tested before anything is broken. If that is the case, we stop and tell you, because we do not remove asbestos.

Can you level a yard and lay turf?

Yes. Landscaping covers clearing, levelling and grading the ground so water runs away from the house, building up garden beds and edges, and laying turf once the ground is ready.

Do you need the engineer's plans?

For footings, slab cuts and bulk excavation, yes. The engineer's plans set the depth, width and position of what we dig. For a trench or a landscaping job, a site plan or a few photos are usually enough.

Can I call you outside business hours?

Yes. We answer the phone at any hour, every day. If a trench has collapsed or a pipe has been hit, tell us the suburb and what has happened, and keep people back from the edge until we talk.

Which areas do you cover?

We travel across Sydney, from the CBD and inner south to Parramatta, Western Sydney, the south-west, and St George and Sutherland. If your suburb is not on our list, ask anyway.

Ready when you are

Book Civil Excavation and Earthworks in Sydney Today

Send us the civil or engineering plan that shows the design levels, even a photo of the printed sheet. Text it to the mobile or email it, and add the street address. That one sheet tells us most of what we need to price the job.

0485 057 312

24 hours a day, 7 days a week

Not urgent? Send us the job instead