Trenchless Underground Boring (Grundomat) in Sydney, NSW

What is included

What Is Included in Our Trenchless Underground Boring (Grundomat)

  • We get the underground service plans first, because a bore runs blind and cannot see a gas main.
  • Any service crossing the bore line is potholed, so we know its exact depth before the tool goes in.
  • A launch pit is dug on one side, long enough to set the tool level and aimed at the target.
  • A smaller target pit is dug on the far side, where the tool is meant to come out.
  • Compressed air drives the piercing tool through the soil, pressing the ground aside instead of digging it out.
  • The conduit or pipe is pulled through the bore and left ready for the electrician or plumber.
  • Both pits are backfilled in layers, compacted, and the turf or pavers put back over them.
  • We sketch the bore line and depth for your records, then sweep the driveway and leave.

Why us

Why Choose Us for Trenchless Underground Boring (Grundomat)?

Accountable for every job, long after the day

Every trenchless underground boring job is done by the people who will still be here next year.

Tested and signed off before we leave

Everything we touch on your trenchless underground boring is tested before we go, you get walked through exactly what was done.

Local excavation contractors, not a call centre

An excavation contractor answers the phone and the same faces come back if the job runs over a day.

How the job runs

Why the two pits decide the bore

01

What we ask on the phone

We ask what is going under, how long the run is and what sits on top: a driveway, a path or a garden bed. We also ask what pipe or conduit size the electrician or plumber wants, because that sets the tool. If the run is long or the ground is rocky, we tell you then that a bore may not suit it.

02

A quote built on the pits

The written quote names the length of the bore, where each pit sits, the conduit or pipe size, and how the surface over each pit is put back. It also says what happens if the tool meets rock or an old footing and stops: we dig down to it, or we move the line. You know that before we start.

03

Bore day and handover

We set out the pits, dig them by machine or by hand depending on access, and run the bore. Once the conduit or pipe is through, both pits are backfilled and compacted in layers and the surface is reinstated. Before we leave, we walk the line with you and show you where the bore runs.

Common questions

Frequently Asked Questions

What size jobs do you take on?

Small residential jobs through to larger civil and infrastructure work. A single trench across a front lawn, a set of footings for an extension, a bulk cut for a new slab and the underground services for a commercial site are all jobs we do.

Can your machine get into a narrow side passage?

Usually, yes. A mini excavator fits through most gates and side passages that a larger machine cannot. Send a photo of the narrowest point with a tape measure across it, and we will tell you whether the machine fits or whether that part has to be dug by hand.

Do you connect the power, water or sewer once the trench is dug?

No. We do the civil side: digging the trench to depth, bedding, laying the conduit or pipe, installing pits, backfilling and reinstating. The connection, testing and sign-off are done by an electrician or a plumber, and we work around their timing.

What is non-destructive digging, and when do I need it?

It means opening the ground with water and vacuum, or by hand, instead of a bucket. It is used where cables, gas lines or water mains are close to the dig, so they can be found and exposed without being damaged.

Do you take the spoil away?

Where the job calls for it, yes. Spoil is loaded into a tipper and taken off site. Where it can be reused on the block for backfill or levelling, we talk about that with you first, because it changes how much leaves the site.

What if you hit rock or old fill?

How deep the rock sits, and whether there is buried rubble or old fill, only shows once the bucket is in the ground. If we find something that changes the job, we stop and tell you before the work carries on.

Do you check for underground services before digging?

Every time. We get the underground service plans for the site before we dig, through Before You Dig Australia, and anything close to the line is exposed by hand or vacuum before a machine works near it.

Do you do strip outs and demolition?

Yes, including bathroom strip outs and wider internal strip outs. If old sheeting or materials might contain asbestos, they have to be tested before anything is broken. If that is the case, we stop and tell you, because we do not remove asbestos.

Can you level a yard and lay turf?

Yes. Landscaping covers clearing, levelling and grading the ground so water runs away from the house, building up garden beds and edges, and laying turf once the ground is ready.

Do you need the engineer's plans?

For footings, slab cuts and bulk excavation, yes. The engineer's plans set the depth, width and position of what we dig. For a trench or a landscaping job, a site plan or a few photos are usually enough.

Can I call you outside business hours?

Yes. We answer the phone at any hour, every day. If a trench has collapsed or a pipe has been hit, tell us the suburb and what has happened, and keep people back from the edge until we talk.

Which areas do you cover?

We travel across Sydney, from the CBD and inner south to Parramatta, Western Sydney, the south-west, and St George and Sutherland. If your suburb is not on our list, ask anyway.

Ready when you are

Book Trenchless Underground Boring (Grundomat) in Sydney Today

Send us a photo of the driveway or path with a tape measure laid along where the pipe needs to cross. Put a bucket or a brick at each end so we can see where the bore starts and where it has to come out. A text to the mobile or an email is fine.